








$10.00
Generation
5Language
EnglishModel of Truck
D275AX-5Region
JapanTruck Class
D275Illustrated factory Field Assembly Manual for Komatsu Crawler Dozers Models D275AX-5.
This manual will assist you in for your crawler dozer.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
D275AX-5 (SN: 30001-40000)
Format: PDF, 129 pages
Language: English
Table of Contents:
Preface
Specifications
Precautions for field assembly
Assembly procedure, necessary equipment, and schedule
Layout of kit
Style for transportation
Tools list for field assembly
Sketch of tools
Tightening torque
Coating materials
A. Assembly
A-1 Installation of chassis
A-2 Installation of track frame
A-3 Installation of ripper
A-4 Adding oil to pivot chamber
A-5 Installing track shoes
A-6 Assembly of blade (For Semi-U-dozer・U-dozer)
A-7 Assembly of blade (For Sigmadozer)
A-8 Installation of blade
A-9 Installation of operator’s cab
A-10 Installation of ROPS
A-11 Check track tension
A-12 Check of oil and coolant levels
A-13 Lubricating
A-14 Bleeding air from hydraulic cylinders
A-15 Installation of KOMTRAX antenna
A-16 Installing lunchbox band (if equipped)
M. Check and maintenance procedures after completion of assembly
M-1 Check and adjustment of operator's cab
M-2 Inspection of machine monitor
Field assembly inspection report
This manual will assist you in for your crawler dozer.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
D275AX-5 (SN: 30001-40000)
Format: PDF, 129 pages
Language: English
Table of Contents:
Preface
Specifications
Precautions for field assembly
Assembly procedure, necessary equipment, and schedule
Layout of kit
Style for transportation
Tools list for field assembly
Sketch of tools
Tightening torque
Coating materials
A. Assembly
A-1 Installation of chassis
A-2 Installation of track frame
A-3 Installation of ripper
A-4 Adding oil to pivot chamber
A-5 Installing track shoes
A-6 Assembly of blade (For Semi-U-dozer・U-dozer)
A-7 Assembly of blade (For Sigmadozer)
A-8 Installation of blade
A-9 Installation of operator’s cab
A-10 Installation of ROPS
A-11 Check track tension
A-12 Check of oil and coolant levels
A-13 Lubricating
A-14 Bleeding air from hydraulic cylinders
A-15 Installation of KOMTRAX antenna
A-16 Installing lunchbox band (if equipped)
M. Check and maintenance procedures after completion of assembly
M-1 Check and adjustment of operator's cab
M-2 Inspection of machine monitor
Field assembly inspection report
General
Generation
5Language
EnglishModel of Truck
D275AX-5Region
JapanTruck Class
D275Type of Document
Field Assembly ManualType of Truck
Crawler DozerReviews: 0
There are no reviews for this product.
Questions: 0
No questions about this product.