








$10.00
Generation
7Language
EnglishModel of Truck
HD785-7Region
JapanTruck Class
HD785Illustrated factory Field Assembly Manual for Komatsu Rigid Dump Trucks Models HD785-7.
This manual will assist you in for your rigid dump truck.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
HD785-7 (SN: 30001-)
Format: PDF, 221 pages
Language: English
Table of Contents:
Outline of division (Only main components)
Dimensions of main components
Layout of work space
Rough schedule of assembly and welding
List of jigs, tools, and consumables for field assembling
Assembly process
Oil, grease, and coolant
Levels of oil, grease, and coolant
Positioning rear axle assembly
Slinging and moving of bare machine
Connection of rod and rear suspension
Positioning bare machine
Connection of rear axle cooling hose
Connection of rear axle brake hose
Connection of rear axle brake hose (ASR specification: If equipped)
Connection of valve sub-assembly wiring harness (ASR specification: If equipped)
Connection and fixing of piping going to rear axle (Sand terrain/ASR specification: If equipped)
Connection and fixing of rear grease piping and supply of grease
Preparation for installing front axle
Installation of front axle
Connection of front axle suspension pressure sensor
Connection of front axle wheel speed sensor (ABS specification: If equipped)
Connection of steering cylinder and tie rod
Connection of front axle brake cooling hoses
Connection of front axle brake hoses
Connection of front axle auto suspension piping
Fixing of front axle auto suspension piping
Fixing of front axle auto grease piping (If equipped: Auto grease specification)
Connection of left front axle auto grease piping (If equipped: Auto grease specification)
Connection of right front axle auto grease piping (If equipped: Auto grease specification)
Installation of bumper and front axle steps
Installation of front axle step (EU specification)
Installation of front axle step
Installation of front axle step: Diagonal ladder specification (If equipped)
Installation of tire and wheel assembly
Installation of drive shaft
Installation of oil quick charge box (If equipped: Oil quick charge specification)
Installation of fuel tank wiring harness cover
Installation of toolbox and tool kit
Installation of fuel tank step (If equipped)
Installation of rear support
Installation of rear support (Muffler specification: If equipped)
Installation of rear support (ABS specification: If equipped)
Installation of rear support (Sand terrain specification: If equipped)
Installation of muffler
Installation of muffler (Body heating-less/Exhaust selector box specification: If equipped)
Installation of fire prevention cover
Installation of front support
Installation of front support (Fog lamp specification: If equipped)
Installation of front support (Fog lamp, beacon lamp, HID headlamp specification: If equipped)
Installation of steering valve
Preparation for installing cab
Installation of cab
Connection of ABS piping (If equipped)
Connection of column
Installation of washer tank
Connection of cab wiring
Connection of cab wiring (ASR/ABS specification: If equipped)
Connection of engine prelubrication harness to cab (If equipped: Engine prelubrication specification)
Connection and fixing of engine compartment lamp wiring harness (If equipped)
Connection of auto grease harness to cab (If equipped: Auto grease specification)
Connection of engine stop harness to cab (If equipped: Engine emergency stop specification)
Installation and fixing of steering hoses
Fixing of air conditioner drain hose
Installation of steering hose cover
Connection of air conditioner and heater hoses
Connection of cab floor wiring
Fixing of ASR/ABS wiring harness (If equipped)
Connection and fixing of ABS wiring harness (ABS specification: If equipped)
Installation of cover under cab
Wiring of front glass with heater wire (If equipped)
Installation of cab seal
Installation of ambient temperature sensor wiring harness
Installation of undercab wiring harness connector
Connection and fixing of rear view camera wiring harness (if equipped)
Installation of hand rail and mirror to the R.H. platform assembly
Installation of right fender
Installation of right fender (If equipped: Body heating-less muffler specification)
Installation of fuel tank quick charge-less hose (If equipped)
Installation of fuel tank quick chargeless hose: Muffler specification (If equipped: muffler specification)
Assembly of diagonal ladder (if equipped)
Installation of cab step: Diagonal ladder specification (if equipped)
Installation of diagonal ladder
Installation of cab step
Installation of L.H. under view mirror (If equipped)
Installation of fire extinguisher (If equipped)
Installing radio antenna and fixing its cable
Installation of L.H. fender
Installation of left side mudguard
Installation of grille guard
Installation of left payload lamp (If equipped)
Installation of left side lamp (If equipped)
Installation of right payload lamp (If equipped)
Installation of right side lamp (If equipped)
Installation of left fender side lamp wiring harness (If equipped)
Installation of right fender side lamp wiring harness (If equipped)
Installation of right fender side lamp wiring harness. (If equipped: Body heating-less muffler, exhaust gas selector box muffler specification)
Installation of KOMTRAX (If equipped)
Fixing of ORBCOMM antenna (If equipped)
Connection and fixing of harness and hose going to auto grease pump -1 (If equipped: Auto grease specification)
Connection and fixing of harness and hose going to auto grease pump - 2 (If equipped: Auto grease specification)
Removal of hoist cylinder fixing bracket
Connection of hoist cylinder piping
Welding of body
Sticking of body decal
Supply of oil
Slinging of body
Installation of hinge pin
Connecting hoist cylinder
Hoist cylinder grease piping
Fixing of auto grease piping to body (If equipped: Auto grease specification)
Installation of field welding protection cover
Installation of body mount
Procedure for adjusting body mount shim
Field welding of exhaust tube
Assembly of body heater cover
Installation of poke ejector
Installation of poke ejector storage pin
Installation of body mudguard
Installation of body lock pin
Installation of transmission underguard
Installation of front handle
Connection of dump sensor
Procedure for adjusting dump sensor
Calibrating dump control
Adjustment of optical axis of light
Bleeding air from brake
Bleeding air from brake of ASR specification (ASR specification: If equipped)
Bleeding air from ABS circuit (ABS specification: If equipped)
Adjusting suspension
Charging air conditioner with refrigerant
Fitting of floating seal
Painting
Touchup
Sticking of front axle decal
Operating procedure of prelubrication system (If equipped: Engine prelubrication specification)
Installation of chocks (If equipped)
Installation of radiator curtain (If equipped)
Installation and connection of beacon lamp (If equipped: Yellow beacon lamp specification)
Assembly of power ladder step
Refilling power ladder with oil
Adjustment of power ladder operating time
Installation of additional under view mirror
Adjustment procedure
T-0010 Bleeding air from fuel circuit 1 (If equipped: Extra low-grade fuel specification)
T-0020 Bleeding air from fuel circuit 2 (If equipped: Extra low-grade fuel specification)
T-0030 Setting of machine monitor
T-0040 Selection of machine model
T-0050 Selection of optional component
T-0060 Selection of option
T-0070 Option setting/no-setting selection screen - Saving of change of option selection
T-0080 OFF setting of corrosion resistor with maintenance monitor
T-0090 Adjustment of body positioner sensor
T-0100 Deletion of electrical system fault history (1)
T-0110 Deletion of electrical system fault history (2)
Welding procedure
C-0010 Preparation of welding body
C-0020 Assembly of split body (1/2)
C-0030 Assembly of split body (2/2)
C-0040 Tack welding body
C-0050 Welding body (1/2)
C-0060 Welding body (2/2)
C-0070 Welding body instruction (1/2)
C-0080 Welding body instruction (2/2)
C-0090 Turn over the body
C-0100 Welding body protector (1/2)
C-0110 Welding body protector (2/2)
C-0120 Finishing and painting welded parts of body
C-0130 Welding front body mount bracket
Appendix
Field assembly inspection report
This manual will assist you in for your rigid dump truck.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
HD785-7 (SN: 30001-)
Format: PDF, 221 pages
Language: English
Table of Contents:
Outline of division (Only main components)
Dimensions of main components
Layout of work space
Rough schedule of assembly and welding
List of jigs, tools, and consumables for field assembling
Assembly process
Oil, grease, and coolant
Levels of oil, grease, and coolant
Positioning rear axle assembly
Slinging and moving of bare machine
Connection of rod and rear suspension
Positioning bare machine
Connection of rear axle cooling hose
Connection of rear axle brake hose
Connection of rear axle brake hose (ASR specification: If equipped)
Connection of valve sub-assembly wiring harness (ASR specification: If equipped)
Connection and fixing of piping going to rear axle (Sand terrain/ASR specification: If equipped)
Connection and fixing of rear grease piping and supply of grease
Preparation for installing front axle
Installation of front axle
Connection of front axle suspension pressure sensor
Connection of front axle wheel speed sensor (ABS specification: If equipped)
Connection of steering cylinder and tie rod
Connection of front axle brake cooling hoses
Connection of front axle brake hoses
Connection of front axle auto suspension piping
Fixing of front axle auto suspension piping
Fixing of front axle auto grease piping (If equipped: Auto grease specification)
Connection of left front axle auto grease piping (If equipped: Auto grease specification)
Connection of right front axle auto grease piping (If equipped: Auto grease specification)
Installation of bumper and front axle steps
Installation of front axle step (EU specification)
Installation of front axle step
Installation of front axle step: Diagonal ladder specification (If equipped)
Installation of tire and wheel assembly
Installation of drive shaft
Installation of oil quick charge box (If equipped: Oil quick charge specification)
Installation of fuel tank wiring harness cover
Installation of toolbox and tool kit
Installation of fuel tank step (If equipped)
Installation of rear support
Installation of rear support (Muffler specification: If equipped)
Installation of rear support (ABS specification: If equipped)
Installation of rear support (Sand terrain specification: If equipped)
Installation of muffler
Installation of muffler (Body heating-less/Exhaust selector box specification: If equipped)
Installation of fire prevention cover
Installation of front support
Installation of front support (Fog lamp specification: If equipped)
Installation of front support (Fog lamp, beacon lamp, HID headlamp specification: If equipped)
Installation of steering valve
Preparation for installing cab
Installation of cab
Connection of ABS piping (If equipped)
Connection of column
Installation of washer tank
Connection of cab wiring
Connection of cab wiring (ASR/ABS specification: If equipped)
Connection of engine prelubrication harness to cab (If equipped: Engine prelubrication specification)
Connection and fixing of engine compartment lamp wiring harness (If equipped)
Connection of auto grease harness to cab (If equipped: Auto grease specification)
Connection of engine stop harness to cab (If equipped: Engine emergency stop specification)
Installation and fixing of steering hoses
Fixing of air conditioner drain hose
Installation of steering hose cover
Connection of air conditioner and heater hoses
Connection of cab floor wiring
Fixing of ASR/ABS wiring harness (If equipped)
Connection and fixing of ABS wiring harness (ABS specification: If equipped)
Installation of cover under cab
Wiring of front glass with heater wire (If equipped)
Installation of cab seal
Installation of ambient temperature sensor wiring harness
Installation of undercab wiring harness connector
Connection and fixing of rear view camera wiring harness (if equipped)
Installation of hand rail and mirror to the R.H. platform assembly
Installation of right fender
Installation of right fender (If equipped: Body heating-less muffler specification)
Installation of fuel tank quick charge-less hose (If equipped)
Installation of fuel tank quick chargeless hose: Muffler specification (If equipped: muffler specification)
Assembly of diagonal ladder (if equipped)
Installation of cab step: Diagonal ladder specification (if equipped)
Installation of diagonal ladder
Installation of cab step
Installation of L.H. under view mirror (If equipped)
Installation of fire extinguisher (If equipped)
Installing radio antenna and fixing its cable
Installation of L.H. fender
Installation of left side mudguard
Installation of grille guard
Installation of left payload lamp (If equipped)
Installation of left side lamp (If equipped)
Installation of right payload lamp (If equipped)
Installation of right side lamp (If equipped)
Installation of left fender side lamp wiring harness (If equipped)
Installation of right fender side lamp wiring harness (If equipped)
Installation of right fender side lamp wiring harness. (If equipped: Body heating-less muffler, exhaust gas selector box muffler specification)
Installation of KOMTRAX (If equipped)
Fixing of ORBCOMM antenna (If equipped)
Connection and fixing of harness and hose going to auto grease pump -1 (If equipped: Auto grease specification)
Connection and fixing of harness and hose going to auto grease pump - 2 (If equipped: Auto grease specification)
Removal of hoist cylinder fixing bracket
Connection of hoist cylinder piping
Welding of body
Sticking of body decal
Supply of oil
Slinging of body
Installation of hinge pin
Connecting hoist cylinder
Hoist cylinder grease piping
Fixing of auto grease piping to body (If equipped: Auto grease specification)
Installation of field welding protection cover
Installation of body mount
Procedure for adjusting body mount shim
Field welding of exhaust tube
Assembly of body heater cover
Installation of poke ejector
Installation of poke ejector storage pin
Installation of body mudguard
Installation of body lock pin
Installation of transmission underguard
Installation of front handle
Connection of dump sensor
Procedure for adjusting dump sensor
Calibrating dump control
Adjustment of optical axis of light
Bleeding air from brake
Bleeding air from brake of ASR specification (ASR specification: If equipped)
Bleeding air from ABS circuit (ABS specification: If equipped)
Adjusting suspension
Charging air conditioner with refrigerant
Fitting of floating seal
Painting
Touchup
Sticking of front axle decal
Operating procedure of prelubrication system (If equipped: Engine prelubrication specification)
Installation of chocks (If equipped)
Installation of radiator curtain (If equipped)
Installation and connection of beacon lamp (If equipped: Yellow beacon lamp specification)
Assembly of power ladder step
Refilling power ladder with oil
Adjustment of power ladder operating time
Installation of additional under view mirror
Adjustment procedure
T-0010 Bleeding air from fuel circuit 1 (If equipped: Extra low-grade fuel specification)
T-0020 Bleeding air from fuel circuit 2 (If equipped: Extra low-grade fuel specification)
T-0030 Setting of machine monitor
T-0040 Selection of machine model
T-0050 Selection of optional component
T-0060 Selection of option
T-0070 Option setting/no-setting selection screen - Saving of change of option selection
T-0080 OFF setting of corrosion resistor with maintenance monitor
T-0090 Adjustment of body positioner sensor
T-0100 Deletion of electrical system fault history (1)
T-0110 Deletion of electrical system fault history (2)
Welding procedure
C-0010 Preparation of welding body
C-0020 Assembly of split body (1/2)
C-0030 Assembly of split body (2/2)
C-0040 Tack welding body
C-0050 Welding body (1/2)
C-0060 Welding body (2/2)
C-0070 Welding body instruction (1/2)
C-0080 Welding body instruction (2/2)
C-0090 Turn over the body
C-0100 Welding body protector (1/2)
C-0110 Welding body protector (2/2)
C-0120 Finishing and painting welded parts of body
C-0130 Welding front body mount bracket
Appendix
Field assembly inspection report
General
Generation
7Language
EnglishModel of Truck
HD785-7Region
JapanTruck Class
HD785Type of Document
Field Assembly ManualType of Truck
Rigid Dump TruckReviews: 0
There are no reviews for this product.
Questions: 0
No questions about this product.