








$10.00
Generation
7Language
EnglishModel of Truck
PC600LC-7, PC600-7Region
JapanTruck Class
PC600Illustrated factory Field Assembly Manual for Komatsu Crawler Excavators Models PC600-7 and PC600LC-7.
This manual will assist you in for your crawler excavator.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
PC600-7 (SN: 20001-)
PC600LC-7 (SN: 20001-)
Format: PDF, 87 pages
Language: English
Table of Contents:
FOREWORD
SPECIFICATIONS
FIELD ASSEMBLING
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
TRANSPORTATION
PACKING STYLE FOR TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING
STANDARD TIGHTENING TORQUE
A. ASSEMBLY OF BASE MACHINE
A-1. INSTALLATION OF LEFT AND RIGHT TRACK FRAMES
A-2. INSTALLATION OF TRAVEL PIPE
A-3. INSTALLATION OF TOP GUARD
A-4. INSTALLATION OF REARVIEW MIRROR
A-5. INSTALLATION OF HANDRAIL
A-6. INSTALLATION OF STEP
A-7. INSTALLATION OF LEFT SIDE STEP
A-8. STICKING SEAT TO COUNTERWEIGHT
A-9. REMOVAL OF MUFFLER TAIL PIPE
A-10. INSTALLATION OF COUNTERWEIGHT
A-11. INSTALLATION OF MUFFLER TAIL PIPE
A-12. INSTALLATION OF ORBCOMM ANTENNA (IF EQUIPPED)
A-13. INSTALLATION OF STEP LIGHT
A-14. EXTENSION OF TRACK FRAME GAUGE
A-15. INSTALLATION OF TRAVEL PIPING COVER
A-16. TESTING TRACK SHOE TENSION
A-17. INSPECTION OF OIL AMOUNT AND WATER AMOUNT
A-18. PARTS TO BE TOUCHED UP AFTER FIELD ASSEMBLY
B. ASSEMBLING OF WORK EQUIPMENT
B-1. ASSEMBLY OF BOOM FOOT PIN, BOOM CYLINDER FOOT PIN
B-2. ASSEMBLY OF BOOM ASSEMBLY
B-3. INSTALLATION OF BOOM CYLINDER FOOT
B-4. INSTALLATION OF BOOM CYLINDER HOSES
B-5. INSTALLATION OF HOSES FROM CHASSIS ALONG TOP OF BOOM
B-6. ASSEMBLY OF BOOM CYLINDER
B-7. ASSEMBLY OF ARM CYLINDER
B-8. INSTALLATION OF ARM CYLINDER HOSES
B-9. INSTALLATION OF ARM ASSEMBLY
B-10. INSTALLATION OF BUCKET CYLINDER HOSES BETWEEN BOOM AND BUCKET CYLINDER
B-11. INSTALLATION OF BUCKET
B-12. CONNECTION OF WORK EQUIPMENT GREASE PIPING
B-13. CONNECTION OF WORK EQUIPMENT WIRING
B-14. GREASING AFTER ASSEMBLING WORK EQUIPMENT
M. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
M-1. INSPECTION OF OIL LEVEL IN HYDRAULIC TANK AND REFILL
M-2. REPLACEMENT OF RETURN FILTER (STANDARD FILTER TO FLUSHING FILTER)
M-3. FLUSHING OF HYDRAULIC CIRCUIT
FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
This manual will assist you in for your crawler excavator.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
PC600-7 (SN: 20001-)
PC600LC-7 (SN: 20001-)
Format: PDF, 87 pages
Language: English
Table of Contents:
FOREWORD
SPECIFICATIONS
FIELD ASSEMBLING
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
TRANSPORTATION
PACKING STYLE FOR TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING
STANDARD TIGHTENING TORQUE
A. ASSEMBLY OF BASE MACHINE
A-1. INSTALLATION OF LEFT AND RIGHT TRACK FRAMES
A-2. INSTALLATION OF TRAVEL PIPE
A-3. INSTALLATION OF TOP GUARD
A-4. INSTALLATION OF REARVIEW MIRROR
A-5. INSTALLATION OF HANDRAIL
A-6. INSTALLATION OF STEP
A-7. INSTALLATION OF LEFT SIDE STEP
A-8. STICKING SEAT TO COUNTERWEIGHT
A-9. REMOVAL OF MUFFLER TAIL PIPE
A-10. INSTALLATION OF COUNTERWEIGHT
A-11. INSTALLATION OF MUFFLER TAIL PIPE
A-12. INSTALLATION OF ORBCOMM ANTENNA (IF EQUIPPED)
A-13. INSTALLATION OF STEP LIGHT
A-14. EXTENSION OF TRACK FRAME GAUGE
A-15. INSTALLATION OF TRAVEL PIPING COVER
A-16. TESTING TRACK SHOE TENSION
A-17. INSPECTION OF OIL AMOUNT AND WATER AMOUNT
A-18. PARTS TO BE TOUCHED UP AFTER FIELD ASSEMBLY
B. ASSEMBLING OF WORK EQUIPMENT
B-1. ASSEMBLY OF BOOM FOOT PIN, BOOM CYLINDER FOOT PIN
B-2. ASSEMBLY OF BOOM ASSEMBLY
B-3. INSTALLATION OF BOOM CYLINDER FOOT
B-4. INSTALLATION OF BOOM CYLINDER HOSES
B-5. INSTALLATION OF HOSES FROM CHASSIS ALONG TOP OF BOOM
B-6. ASSEMBLY OF BOOM CYLINDER
B-7. ASSEMBLY OF ARM CYLINDER
B-8. INSTALLATION OF ARM CYLINDER HOSES
B-9. INSTALLATION OF ARM ASSEMBLY
B-10. INSTALLATION OF BUCKET CYLINDER HOSES BETWEEN BOOM AND BUCKET CYLINDER
B-11. INSTALLATION OF BUCKET
B-12. CONNECTION OF WORK EQUIPMENT GREASE PIPING
B-13. CONNECTION OF WORK EQUIPMENT WIRING
B-14. GREASING AFTER ASSEMBLING WORK EQUIPMENT
M. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
M-1. INSPECTION OF OIL LEVEL IN HYDRAULIC TANK AND REFILL
M-2. REPLACEMENT OF RETURN FILTER (STANDARD FILTER TO FLUSHING FILTER)
M-3. FLUSHING OF HYDRAULIC CIRCUIT
FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
General
Generation
7Language
EnglishModel of Truck
PC600LC-7, PC600-7Region
JapanTruck Class
PC600Type of Document
Field Assembly ManualType of Truck
Crawler ExcavatorReviews: 0
There are no reviews for this product.
Questions: 0
No questions about this product.