








$10.00
Generation
8Language
EnglishModel of Truck
PC600-8, PC600LC-8Region
JapanTruck Class
PC600Illustrated factory Field Assembly Manual for Komatsu Crawler Excavators Models PC600-8 and PC600LC-8.
This manual will assist you in for your crawler excavator.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
PC600-8 (SN: 30001-)
PC600LC-8 (SN: 30001-)
Format: PDF, 138 pages
Language: English
Table of Contents:
FOREWORD
SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
DISPOSAL OF REMOVED PARTS
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
KIT LAYOUT DIAGRAM
TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING
TIGHTENING TORQUE
A. ASSEMBLY OF CHASSIS
A-1. Installation of Left and Right Track Frames
A-2. Installation of Travel Pipe
A-3. Installation of Operator Cab’s Left Handrail
A-4. Installation of Operator Cab’s Door Stopper and Striker
A-5. Installation of Rearview Mirror
A-6. Installation of Handrail
A-7. Installation of Step
A-8. Installation of Left Side Step
A-9. Sticking Sheet to Counterweight
A-10. Installation of Counterweight
A-11. Installation of Step Light
A-12. Installation of Travel Piping Cover
A-13. Testing Track Shoe Tension
A-14. Check Fuel, Coolant and Oil Levels
B. ASSEMBLING OF WORK EQUIPMENT
B-1. Assembly of Arm Cylinder
B-2. Connection of Arm Cylinder Hoses
B-3. Installation of Boom Cylinder
B-4. Installation of Boom Foot Dust Seal
B-5. Assembly of Boom Assembly
B-6. Installation of Boom Cylinder Hoses
B-7. Installation of Hoses from Chassis Along Top of Boom
B-8. Connection of Boom Cylinder Head
B-9. Installation of Arm Assembly
B-10. Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
B-11. Installation of Bucket
B-12. Connection of Work Equipment Grease Piping
B-13. Connection of Work Equipment Wiring
B-14. Greasing after Assembling Work Equipment
B-15. Bleeding Air from Work Equipment Circuit
B-16. Parts to be Touched up After Field Assembly
M. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
M-1. Inspection of Oil Level in Hydraulic Tank and Refill
M-2. Replacement of Return Filter (Standard Filter to Flushing Filter)
M-3. Flushing of Hydraulic Circuit
M-4. Error Code
M-5. Operating Method of Monitoring
D. ASSEMBLING OF COUNTERWEIGHT REMOVER
D-1. Sticking Sheet to Counterweight
D-2. Adjustment of Shims for Counterweight
D-3. Greasing
D-4. Installation of Counterweight Remover
D-5. Installation of Covers
D-6. Installation of Clamps
D-7. Installation of Hoses
D-8. Bleeding Air from Counterweight Remover Circuit
D-9. Installation of Counterweight
D-10. Check of Operation
Field Assembly Inspection Report (Backhoe)
This manual will assist you in for your crawler excavator.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
PC600-8 (SN: 30001-)
PC600LC-8 (SN: 30001-)
Format: PDF, 138 pages
Language: English
Table of Contents:
FOREWORD
SPECIFICATIONS
PRECAUTIONS FOR FIELD ASSEMBLY
DISPOSAL OF REMOVED PARTS
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
KIT LAYOUT DIAGRAM
TRANSPORTATION
LIST OF TOOLS FOR FIELD ASSEMBLING
TIGHTENING TORQUE
A. ASSEMBLY OF CHASSIS
A-1. Installation of Left and Right Track Frames
A-2. Installation of Travel Pipe
A-3. Installation of Operator Cab’s Left Handrail
A-4. Installation of Operator Cab’s Door Stopper and Striker
A-5. Installation of Rearview Mirror
A-6. Installation of Handrail
A-7. Installation of Step
A-8. Installation of Left Side Step
A-9. Sticking Sheet to Counterweight
A-10. Installation of Counterweight
A-11. Installation of Step Light
A-12. Installation of Travel Piping Cover
A-13. Testing Track Shoe Tension
A-14. Check Fuel, Coolant and Oil Levels
B. ASSEMBLING OF WORK EQUIPMENT
B-1. Assembly of Arm Cylinder
B-2. Connection of Arm Cylinder Hoses
B-3. Installation of Boom Cylinder
B-4. Installation of Boom Foot Dust Seal
B-5. Assembly of Boom Assembly
B-6. Installation of Boom Cylinder Hoses
B-7. Installation of Hoses from Chassis Along Top of Boom
B-8. Connection of Boom Cylinder Head
B-9. Installation of Arm Assembly
B-10. Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
B-11. Installation of Bucket
B-12. Connection of Work Equipment Grease Piping
B-13. Connection of Work Equipment Wiring
B-14. Greasing after Assembling Work Equipment
B-15. Bleeding Air from Work Equipment Circuit
B-16. Parts to be Touched up After Field Assembly
M. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
M-1. Inspection of Oil Level in Hydraulic Tank and Refill
M-2. Replacement of Return Filter (Standard Filter to Flushing Filter)
M-3. Flushing of Hydraulic Circuit
M-4. Error Code
M-5. Operating Method of Monitoring
D. ASSEMBLING OF COUNTERWEIGHT REMOVER
D-1. Sticking Sheet to Counterweight
D-2. Adjustment of Shims for Counterweight
D-3. Greasing
D-4. Installation of Counterweight Remover
D-5. Installation of Covers
D-6. Installation of Clamps
D-7. Installation of Hoses
D-8. Bleeding Air from Counterweight Remover Circuit
D-9. Installation of Counterweight
D-10. Check of Operation
Field Assembly Inspection Report (Backhoe)
General
Generation
8Language
EnglishModel of Truck
PC600-8, PC600LC-8Region
JapanTruck Class
PC600Type of Document
Field Assembly ManualType of Truck
Crawler ExcavatorReviews: 0
There are no reviews for this product.
Questions: 0
No questions about this product.