








$10.00
Generation
6Language
EnglishModel of Truck
PC600LC-6, PC600-6Region
JapanTruck Class
PC600Illustrated factory Field Assembly Manual for Komatsu Crawler Excavators Models PC600-6 and PC600LC-6.
This manual will assist you in for your crawler excavator.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
PC600-6 (SN: 11001-11106)
PC600LC-6 (SN: 11001-11106)
Format: PDF, 125 pages
Language: English
Table of Contents:
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
TRANSPORTATION
PACKING STYLE FOR TRANSPORTATION
STEPS TO TAKE BEFORE AND AFTER ASSEMBLY
TIGHTENING TORQUE OF PIPE THREAD
INSTALLATION OF OPG HEAD GUARD:53 KG
INSTALLATION OF REARVIEW MIRROR
INSTALLATION OF HANDRAIL
INSTALLATION OF STEP
INSTALLATION OF LEFT SIDE STEP
STICKING SEAT TO COUNTERWEIGHT
REMOVAL OF MUFFLER TAIL PIPE
INSTALLATION OF COUNTERWEIGHT
INSTALLATION OF MUFFLER TAIL PIPE
INSTALLATION OF RADIO ANTENNA
INSTALLATION OF LIGHT ON TOP OF CAB
EXTENSION AND RETRACTION OF TRACK FRAME GAUGE
INSTALLATION OF TRAVEL PIPING COVER
BOOM FOOT PIN, BOOM CYLINDER FOOT PIN
BOOM ASSEMBLY
INSTALLATION OF BOOM CYLINDER FOOT
INSTALLATION OF BOOM CYLINDER HOSES
INSTALLATION OF HOSES FROM CHASSIS ALONG TOP OF BOOM
BOOM CYLINDER: 520 KG
ARM CYLINDER
INSTALLATION OF ARM CYLINDER HOSES
INSTALLATION OF ARM ASSEMBLY
INSTALLATION OF BUCKET CYLINDER HOSES BETWEEN BOOM AND BUCKET CYLINDER
WORK EQUIPMENT PIPING FOR BUCKET CYLINDER BETWEEN BOOM AND BUCKET CYLINDER
WORK EQUIPMENT GREASE PIPING
WORK EQUIPMENT WIRING
GREASING ASSEMBLED WORK EQUIPMENT
ASSEMBLY OF LOADING SHOVEL WORK EQUIPMENT
1. RELEASING RESIDUAL PRESSURE IN HYDRAULIC CIRCUIT
2. PULLING OUT BOOM FOOT PIN AND BOOM CYLINDER FOOT PIN
3. INSTALLATION OF BOOM AND ARM ASSEMBLY
4. INSTALLATION OF BOOM CYLINDER
5. INSTALLATION OF BOOM CYLINDER FOOT
6. INSTALLATION OF BOOM CYLINDER HOSES
7. INSTALLATION OF BOOM CYLINDER ROD PIN
8. INSTALLATION OF ARM CYLINDER HOSES
9. INSTALLATION OF BUCKET CYLINDER
10. INSTALLATION OF BUCKET CYLINDER HOSE
11. INSTALLATION OF CONNECTING HOSES BETWEEN CHASSIS AND BOOM TOP
12. INSTALLATION OF BOTTOM DUMP CYLINDER HOSES
13. INSTALLATION OF BUCKET ASSEMBLY (1/2)
13. INSTALLATION OF BUCKET ASSEMBLY (2/2)
14. INSTALLATION OF WORKING LAMPS
15. INSTALLATION OF WORK EQUIPMENT GREASE PIPING
16. GREASING AFTER ASSEMBLING OF WORK EQUIPMENT
17. BLEEDING AIR FROM WORK EQUIPMENT CIRCUIT
18. FLUSHING OF WORK EQUIPMENT PIPING
19. CHECKING OIL LEVEL IN HYDRAULIC TANK AND ADDING OIL
FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
FIELD ASSEMBLY INSPECTION REPORT (LOADING SHOVEL)
This manual will assist you in for your crawler excavator.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
PC600-6 (SN: 11001-11106)
PC600LC-6 (SN: 11001-11106)
Format: PDF, 125 pages
Language: English
Table of Contents:
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
TRANSPORTATION
PACKING STYLE FOR TRANSPORTATION
STEPS TO TAKE BEFORE AND AFTER ASSEMBLY
TIGHTENING TORQUE OF PIPE THREAD
INSTALLATION OF OPG HEAD GUARD:53 KG
INSTALLATION OF REARVIEW MIRROR
INSTALLATION OF HANDRAIL
INSTALLATION OF STEP
INSTALLATION OF LEFT SIDE STEP
STICKING SEAT TO COUNTERWEIGHT
REMOVAL OF MUFFLER TAIL PIPE
INSTALLATION OF COUNTERWEIGHT
INSTALLATION OF MUFFLER TAIL PIPE
INSTALLATION OF RADIO ANTENNA
INSTALLATION OF LIGHT ON TOP OF CAB
EXTENSION AND RETRACTION OF TRACK FRAME GAUGE
INSTALLATION OF TRAVEL PIPING COVER
BOOM FOOT PIN, BOOM CYLINDER FOOT PIN
BOOM ASSEMBLY
INSTALLATION OF BOOM CYLINDER FOOT
INSTALLATION OF BOOM CYLINDER HOSES
INSTALLATION OF HOSES FROM CHASSIS ALONG TOP OF BOOM
BOOM CYLINDER: 520 KG
ARM CYLINDER
INSTALLATION OF ARM CYLINDER HOSES
INSTALLATION OF ARM ASSEMBLY
INSTALLATION OF BUCKET CYLINDER HOSES BETWEEN BOOM AND BUCKET CYLINDER
WORK EQUIPMENT PIPING FOR BUCKET CYLINDER BETWEEN BOOM AND BUCKET CYLINDER
WORK EQUIPMENT GREASE PIPING
WORK EQUIPMENT WIRING
GREASING ASSEMBLED WORK EQUIPMENT
ASSEMBLY OF LOADING SHOVEL WORK EQUIPMENT
1. RELEASING RESIDUAL PRESSURE IN HYDRAULIC CIRCUIT
2. PULLING OUT BOOM FOOT PIN AND BOOM CYLINDER FOOT PIN
3. INSTALLATION OF BOOM AND ARM ASSEMBLY
4. INSTALLATION OF BOOM CYLINDER
5. INSTALLATION OF BOOM CYLINDER FOOT
6. INSTALLATION OF BOOM CYLINDER HOSES
7. INSTALLATION OF BOOM CYLINDER ROD PIN
8. INSTALLATION OF ARM CYLINDER HOSES
9. INSTALLATION OF BUCKET CYLINDER
10. INSTALLATION OF BUCKET CYLINDER HOSE
11. INSTALLATION OF CONNECTING HOSES BETWEEN CHASSIS AND BOOM TOP
12. INSTALLATION OF BOTTOM DUMP CYLINDER HOSES
13. INSTALLATION OF BUCKET ASSEMBLY (1/2)
13. INSTALLATION OF BUCKET ASSEMBLY (2/2)
14. INSTALLATION OF WORKING LAMPS
15. INSTALLATION OF WORK EQUIPMENT GREASE PIPING
16. GREASING AFTER ASSEMBLING OF WORK EQUIPMENT
17. BLEEDING AIR FROM WORK EQUIPMENT CIRCUIT
18. FLUSHING OF WORK EQUIPMENT PIPING
19. CHECKING OIL LEVEL IN HYDRAULIC TANK AND ADDING OIL
FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
FIELD ASSEMBLY INSPECTION REPORT (LOADING SHOVEL)
General
Generation
6Language
EnglishModel of Truck
PC600LC-6, PC600-6Region
JapanTruck Class
PC600Type of Document
Field Assembly ManualType of Truck
Crawler ExcavatorReviews: 0
There are no reviews for this product.
Questions: 0
No questions about this product.