








$10.00
Generation
6Language
EnglishModel of Truck
WA500-6Region
JapanTruck Class
WA500Illustrated factory Field Assembly Manual for Komatsu 4WD Wheeled Loaders Models WA500-6.
This manual will assist you in for your 4wd wheeled loader.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
WA500-6 (SN: 55001-)
Format: PDF, 77 pages
Language: English
Table of Contents:
INSTALLATION AND ADJUSTMENT OF PARTS OTHER THAN OPERATOR'S CAB
INSTALLATION OF ADDITIONAL AND STANDARD WEIGHTS (1/5)-(5/5)
INSTALLATION OF FLOOR MAT
INSTALLATION OF LIFT ARM AND BELL CRANK ASSEMBLY
INSTALLATION OF BUCKET CYLINDER (BELL CRANK SIDE)
INSTALLATION OF BUCKET (1/2), (2/2)
INSTALLATION OF RIM AND TIRE ASSEMBLY
GREASING (1ST TIME)
INSTALLATION OF LIFT ARM POSITIONER
SETTING OF MACHINE MONITOR
DELETION OF ELECTRICAL SYSTEM FAULT HISTORY (1/2), (2/2)
SELECTION OF OPTIONS (1/3), (2/3), (3/3)
ADJUSTMENT OF WORK EQUIPMENT CONTROLLER LIFT ARM ANGLE
ADJUSTMENT OF LOAD METER LIFT ARM ANGLE (1/2), (2/2)
ADJUSTMENT OF WORK EQUIPMENT EPC LEVER DETENT POSITION (1/2), (2/2)
ADJUSTMENT OF WORK EQUIPMENT EPC STARTING CURRENT (1/2), (2/2)
ADJUSTMENT OF BUCKET POSITIONER (1/2), (2/2)
ADJUSTMENT OF LOAD METER EMPTY CALIBRATION (1/2), (2/2)
GREASING (2ND TIME)
TOUCH-UP WORK
INSTALLATION OF OPERATOR'S CAB
NECESSARY TOOLS
SEPARATELY PACKED SPLIT CAB PARTS LIST
SPLIT DUMMY FIXING PARTS SET
PARTS INSTALLED AFTER DISASSEMBLY OF SPLIT CAB (PACKED TOGETHER)
ASSEMBLY PROCEDURE TABLE FOR SPLIT CAB
PREPARATION --- REMOVAL OF VINYL SHEETS (1/9)
PREPARATION --- REMOVAL OF COVERS (2/9)
PREPARATION --- REMOVAL OF PIPING AND HOSE FIXING BOLTS (3/9)
PREPARATION --- REMOVAL OF PIPING AND HOSE FIXING PLATES (4/9)
PREPARATION --- REMOVAL OF PARKING BRAKE SWITCH FIXING BRACKET (5/9)
PREPARATION --- REMOVAL OF REAR COVER (6/9)
PREPARATION --- REMOVAL OF CONTROLLER FIXING COVER AND PLATE (7/9)
PREPARATION --- LOOSENING OF CONTROLLER FIXING BRACKET BOLTS (8/9)
PREPARATION --- REMOVAL OF PILLARS, MONITOR AND FOOT COVER IN CAB (9/9)
INSTALLATION OF CAB --- PREPARATION OF CAB MOUNTING BOLTS AND STICKING OF SEALS (1/19)
INSTALLATION OF CAB --- INSTALLATION OF CAB (2/19)
INSTALLATION OF CAB --- INSTALLATION OF CAB FIXING BOLTS (3/19)
INSTALLATION OF CAB --- INSTALLATION OF BOLTS OF COVER IN CAB (4/19)
INSTALLATION OF CAB --- TIGHTENING OF CAB FIXING BOLTS (5/19)
INSTALLATION OF CAB --- FIXING OF AIR CONDITIONER UNIT (6/19)
INSTALLATION OF CAB --- CONNECTION OF WIRING CONNECTORS (7/19)
INSTALLATION OF CAB --- INSTALLATION OF CAB FRONT COVER (9/19)
INSTALLATION OF CAB --- INSTALLATION OF MONITOR DASHBOARD COVER (10/19)
INSTALLATION OF CAB --- INSTALLATION OF RIGHT AND LEFT PILLAR COVERS IN CAB (11/19)
INSTALLATION OF CAB --- FIXING OF RIGHT CONSOLE (12/19)
INSTALLATION OF CAB --- CONNECTION OF REAR WIPER CONNECTOR AND REAR WASHER HOSE (13/19)
INSTALLATION OF CAB --- INSTALLATION OF LUNCH BOX AND REAR COVER (14/19)
INSTALLATION OF CAB --- INSTALLATION OF FLOOR MAT (15/19)
INSTALLATION OF CAB --- INSTALLATION OF AIR CONDITIONER PIPING AND HEATER HOSE FIXING PLATE (16/19)
INSTALLATION OF CAB --- FIXING OF RESERVOIR TANK AND SUB-TANK HOSE (17/19)
INSTALLATION OF CAB --- INSTALLATION OF RIGHT AND LEFT COVERS UNDER HYDRAULIC TANK (18/19)
INSTALLATION OF CAB --- INSTALLATION OF EXTERNAL AIR FILTER (19/19)
FIELD-ASSEMBLED MACHINE CHECK SHEET
This manual will assist you in for your 4wd wheeled loader.
You can use a Windows, Mac, or Android device to view this manual. You only need to have a PDF reader installed.
Covered Models (Japan):
WA500-6 (SN: 55001-)
Format: PDF, 77 pages
Language: English
Table of Contents:
INSTALLATION AND ADJUSTMENT OF PARTS OTHER THAN OPERATOR'S CAB
INSTALLATION OF ADDITIONAL AND STANDARD WEIGHTS (1/5)-(5/5)
INSTALLATION OF FLOOR MAT
INSTALLATION OF LIFT ARM AND BELL CRANK ASSEMBLY
INSTALLATION OF BUCKET CYLINDER (BELL CRANK SIDE)
INSTALLATION OF BUCKET (1/2), (2/2)
INSTALLATION OF RIM AND TIRE ASSEMBLY
GREASING (1ST TIME)
INSTALLATION OF LIFT ARM POSITIONER
SETTING OF MACHINE MONITOR
DELETION OF ELECTRICAL SYSTEM FAULT HISTORY (1/2), (2/2)
SELECTION OF OPTIONS (1/3), (2/3), (3/3)
ADJUSTMENT OF WORK EQUIPMENT CONTROLLER LIFT ARM ANGLE
ADJUSTMENT OF LOAD METER LIFT ARM ANGLE (1/2), (2/2)
ADJUSTMENT OF WORK EQUIPMENT EPC LEVER DETENT POSITION (1/2), (2/2)
ADJUSTMENT OF WORK EQUIPMENT EPC STARTING CURRENT (1/2), (2/2)
ADJUSTMENT OF BUCKET POSITIONER (1/2), (2/2)
ADJUSTMENT OF LOAD METER EMPTY CALIBRATION (1/2), (2/2)
GREASING (2ND TIME)
TOUCH-UP WORK
INSTALLATION OF OPERATOR'S CAB
NECESSARY TOOLS
SEPARATELY PACKED SPLIT CAB PARTS LIST
SPLIT DUMMY FIXING PARTS SET
PARTS INSTALLED AFTER DISASSEMBLY OF SPLIT CAB (PACKED TOGETHER)
ASSEMBLY PROCEDURE TABLE FOR SPLIT CAB
PREPARATION --- REMOVAL OF VINYL SHEETS (1/9)
PREPARATION --- REMOVAL OF COVERS (2/9)
PREPARATION --- REMOVAL OF PIPING AND HOSE FIXING BOLTS (3/9)
PREPARATION --- REMOVAL OF PIPING AND HOSE FIXING PLATES (4/9)
PREPARATION --- REMOVAL OF PARKING BRAKE SWITCH FIXING BRACKET (5/9)
PREPARATION --- REMOVAL OF REAR COVER (6/9)
PREPARATION --- REMOVAL OF CONTROLLER FIXING COVER AND PLATE (7/9)
PREPARATION --- LOOSENING OF CONTROLLER FIXING BRACKET BOLTS (8/9)
PREPARATION --- REMOVAL OF PILLARS, MONITOR AND FOOT COVER IN CAB (9/9)
INSTALLATION OF CAB --- PREPARATION OF CAB MOUNTING BOLTS AND STICKING OF SEALS (1/19)
INSTALLATION OF CAB --- INSTALLATION OF CAB (2/19)
INSTALLATION OF CAB --- INSTALLATION OF CAB FIXING BOLTS (3/19)
INSTALLATION OF CAB --- INSTALLATION OF BOLTS OF COVER IN CAB (4/19)
INSTALLATION OF CAB --- TIGHTENING OF CAB FIXING BOLTS (5/19)
INSTALLATION OF CAB --- FIXING OF AIR CONDITIONER UNIT (6/19)
INSTALLATION OF CAB --- CONNECTION OF WIRING CONNECTORS (7/19)
INSTALLATION OF CAB --- INSTALLATION OF CAB FRONT COVER (9/19)
INSTALLATION OF CAB --- INSTALLATION OF MONITOR DASHBOARD COVER (10/19)
INSTALLATION OF CAB --- INSTALLATION OF RIGHT AND LEFT PILLAR COVERS IN CAB (11/19)
INSTALLATION OF CAB --- FIXING OF RIGHT CONSOLE (12/19)
INSTALLATION OF CAB --- CONNECTION OF REAR WIPER CONNECTOR AND REAR WASHER HOSE (13/19)
INSTALLATION OF CAB --- INSTALLATION OF LUNCH BOX AND REAR COVER (14/19)
INSTALLATION OF CAB --- INSTALLATION OF FLOOR MAT (15/19)
INSTALLATION OF CAB --- INSTALLATION OF AIR CONDITIONER PIPING AND HEATER HOSE FIXING PLATE (16/19)
INSTALLATION OF CAB --- FIXING OF RESERVOIR TANK AND SUB-TANK HOSE (17/19)
INSTALLATION OF CAB --- INSTALLATION OF RIGHT AND LEFT COVERS UNDER HYDRAULIC TANK (18/19)
INSTALLATION OF CAB --- INSTALLATION OF EXTERNAL AIR FILTER (19/19)
FIELD-ASSEMBLED MACHINE CHECK SHEET
General
Generation
6Language
EnglishModel of Truck
WA500-6Region
JapanTruck Class
WA500Type of Document
Field Assembly ManualType of Truck
4WD Wheeled LoaderReviews: 0
There are no reviews for this product.
Questions: 0
No questions about this product.